Case StudiesBlog

Turning cranes into smart devices with AI and IoT technology.

The CraneView® solution was piloted on Turner’s Manchester Pacific Gateway project in San Diego—a 17-story, 378,000 sq. ft. facility with two tower cranes. The device provided critical insights into crane utilization and productivity and the flow of materials on the jobsite that empowered the team to better plan and sequence construction activities and positively impact schedule and safety. The use of CraneView® also resulted in early demobilization of the tower crane.

״We used CraneView to avoid overtime and reduce the peaks and valleys associated with crane utilization to ensure the cranes were operating as efficiently as possible.”

Chris Brown
Project Superintendent for Turner

Download the case study to learn more.

The buzz about Versatile